Proven strength a broad range
of projects

Established presence in Fiji:

0
+

Employees in Fiji

0
+

Plant and vehicle resources in Fiji

0

Concrete asphalt batching plants built or pending in Fiji

Company details

CR5 provides all-in-one engineering and construction solutions around the world. The Fiji Group has extensive experience throughout the Asia pacific region. It is firmly established and has considerable expansion plans in order to support the growing demand for its expertise.

Where it started

The Chinese Ministry of Railways formed two bureaus: one for construction and one for design.
This became the start of the
journey for CR5.

The ministry’s two bureaus were merged to form the General Bureau of Capital Construction
of the Ministry of Railways.

1958

1950

China Railway Engineering Corporation (CRECG) and China Railway Construction Company (CRCC) were formed as subsidiaries of the ministry.

1989

2000

The two subsidiaries were transferred from the ministry to “Central Large Enterprise Work Commission” of the Communist Party of China.

Where it started

 
1950

The Chinese Ministry of Railways formed two bureaus: one for construction and one for design. This became the start of the journey for CR5.

 
1958

The ministry’s two bureaus were merged to form the General Bureau of Capital Construction of the Ministry of Railways.

 
1989

China Railway Engineering Corporation (CRECG) and China Railway Construction Company (CRCC) were formed as subsidiaries of the ministry.

 
2000

The two subsidiaries were transferred from the ministry to “Central Large Enterprise Work Commission” of the Communist Party of China.

CR5: 870+ local and expat employees in Fiji

With headquarters in Suva, the Fiji group employs 800 local staff alongside 80 Chinese expats.

The group is resourced by a continuously expanding list of plant and transport equipment, including dump trucks, loaders, rollers, road mixers, crew cabs, watercraft, hiper cranes, paver machines, stabilisers and excavators, as well as an impressive 4WD fleet.

Construction requirements are also supported by an asphalt concrete batching plant in Nausori, with similar plants in Lami and Nadi operating soon. A laboratory, which opened in 2018 carries out extensive soil and material testing, and employs 20 people.

Team

Our people are our strength and they have been chosen for their capabilities and work ethic. We combine our collective experience across all areas of construction to deliver exceptional outcomes on projects of every scale.

Jin Ming (Charles Jin)

General Manager

Charles is responsible for the overall management of the project, including programming the works, liaising with stakeholders, cost management, production and all any other matters relating to the projects he overseas.

Since 2008, Charles has had extensive experience with managing communications with internal and external parties to complete several Fijian projects.

Li Songlin (Jimmy Li)

Project Manager

Jimmy’s is the project manager for China Railway no.5 Engineering Group in Fiji, and his background in engineering provides a solid foundation for the company. This ensures that all projects meet an international level of expertise and standards across each project.

Previous projects have required Jimmy to oversee the health and safety procedures and process for various projects in both Fiji and China.

Zhu Xinqiang

Senior Civil Engineer

Zhu’s has a diverse range of Engineering skill sets acquired whilst working on some large projects in China, where he was tasked with scheduling, construction, and liaison before relocating and working in Fiji.

With his construction and technical expertise, Zhu is also able to provide supervisory and scheduling capabilities to help manage internal teams whilst on site.

Wanyin Wang

Construction Manager

Wang is the Construction manager and in charge of the Site’s management, which includes the scheduling of the construction site’s activities, while also managing the construction team and suppliers.

Wang’s experience before joining China Railway No.5 Engineering Group, was in other supervisory roles, and he has lengthy management experience onsite and in project management positions.

Team

Construction requirements are also supported by an asphalt concrete batching plant in Nausori, with similar plants in Lami and Nadi operating soon. A laboratory, which opened in 2018 carries out extensive soil and material testing, and employs 20 people.

Featured Project

Radisson Blu Mirage Resort

Naisoso Island, Fiji

Renaissance Guiyang Hotel

Guiyang City, Guizhou Province, China

Howard Johnson Guizhou Plaza

Guiyang, China

Copyright © 2023 China Railway No.5 Engineering Group Fiji Ltd . All Rights Reserved.